‰ NOW 15 WPM ‰ TEXT IS FROM SEPTEMBER 2015 QST PAGE 32 ‰ HANDLE FURTHER, GIVING IT A STORE BOUGHT LOOK, BY CUTTING A PIECE OF SHRINK TUBE THE REQUIRED LENGTH TO COVER THE HANDLE. SHRINK IT INTO PLACE OVER THE HANDLE WITH YOUR HEAT GUN. SOLDER THE RG 58 COAX AND HAIRPIN MATCH IN PLACE FIGURE 4. STRIP BACK THE COAX THE REQUIRED AMOUNT AND POSITION THE ENDS IN THE HOLES YOU DRILLED IN THE ELEMENT BLADES. WITH THE 5 INCH LENGTH OF SOLID 14 AWG COPPER WIRE, FORM A U THAT HAS A 3/4 INCH SPACING. WITH A PAIR OF SHARP NOSE PLIERS, FORM SHORT 90 DEGREE BENDS IN THE ENDS ‰ END OF 15 WPM TEXT ‚