‰ NOW 5 WPM ‰ TEXT IS FROM JANUARY 2017 QST PAGE 46 ‰ ASSEMBLY CHALLENGES ASSEMBLY OF THE FIVE MAST SECTIONS PRESENTED SEVERAL CHALLENGES. BECAUSE OF THE WAY THE SLIDERS ARE PLACED, THE MAST SECTIONS MUST BE LOADED FROM THE BOTTOM. I STARTED WITH THE LARGEST SECTIONS AND ƒ QST DE W1AW ‰ PROGRESSED THROUGH EACH SUCCESSIVE SMALLER SECTION. FOR EACH SECTION, I THREADED THE STEEL CABLE THROUGH THE SHALLOW ANGLE CABLE MOUNT HOLE AT THE ‰ END OF 5 WPM TEXT ‰ QST DE W1AW ƒ