‰ NOW 20 WPM ‰ TEXT IS FROM DECEMBER 2008 QST PAGES 38, 39 AND 75 ‰ ALLOWED FOR GREATER CLEARANCE OF THE RECEIVING LOOP WIRES FROM THE 2 METER ELEMENTS. TEN FEET OF 3/4 INCH PVC WAS DRIVEN TWO FEET INTO THE SUPPORT MAST TO ACT AS A VERTICAL SUPPORT FOR THE RECEIVING LOOP. A 6 FOOT PIECE OF 1/2 INCH ELECTRICAL CONDUIT WAS INSERTED TO ABOUT HALF WAY DOWN THE PCV TO KEEP IT FROM FLEXING AS SHOWN IN FIGURE 4. JUST ABOVE THE BOOM AND ON THE MAST, A SMALL PIECE OF CLEAR POLYCARBONATE IS BOLTED THROUGH THE MAST TO ACT AS A CENTER INSULATOR. SEE FIGURE 5. THE BOLTS ALSO SECURE THE MAST, PVC AND CONDUIT TOGETHER. BINDING POSTS ARE USED TO SECURE THE WIRES. INSTALLING THE LOOP A PIECE OF 10 GAUGE WIRE RUNS FROM THE POLYCARBONATE INSULATOR ON THE MAST, ALONG THE BOOM, THROUGH THE BOOM ‰ FROM PAGE 75 ‰ 16 1,836 EPA WB0PTD 581 2 6 1,832 KS Starke Co ARC W9JOZ WB9L 344 2 34 ‰ END OF 20 WPM TEXT ‰ QST DE W1AW ƒ