‰ NOW 25 WPM ‰ TEXT IS FROM DECEMBER 2008 QST PAGES 38, 39 AND 75 ‰ 9. THE UHF ELEMENTS AND REFLECTOR SCREEN WERE REMOVED FROM THE MAIN BOOM, ALONG WITH THE LOWER SUPPORT BOOM. THE ELEMENTS WERE TURNED TO THE VERTICAL POSITION FOR FM REPEATER USE. THERE IS NO REASON YOU COULD NOT LEAVE THE ELEMENTS HORIZONTAL FOR 2 METER SSB AND CW WORK. THE FRONT DRIVEN ELEMENT OF THE 2 METER SECTION IS FED DIRECTLY WITH 50 O RG 213 COAXIAL CABLE. NO MATCHING CIRCUIT IS USED AND THE COAX IS TAPED ALONG THE BOOM AND BACK TO THE MAST. ADDING THE LOOP SUPPORTS THE OLD LOWER SUPPORT BOOM WAS CUT IN UNEQUAL PARTS AND ATTACHED TO THE SIDES OF THE MAIN BOOM SO THAT THERE IS ABOUT 87 INCHES FROM MAST TO TIP ON EACH SIDE OF THE BOOM AND ABOUT 86 INCHES FOR THE BOTTOM LEGS OF THE LOOP. THE OLD SUPPORT STRAPS WERE TURNED UP AND AN EGG INSULATOR WAS PLACED INSIDE EACH SUPPORT. SEE FIGURES 2 AND 3. MOUNTING THE EXTENSION PIECES ON THE SIDE OF THE BOOM ‰ FROM PAGE 75 ‰ MI Northern Kentucky ARC K4CO 413 2 23 1,838 KY Holmesburg ARC K3FI 436 2 ‰ END OF 25 WPM TEXT ‰ QST DE W1AW ƒ