2011 ARRL Field Day
What started off as a sub par field day really turned out great with a big 10m opening on Saturday. First, the normal crew I go out with couldn't make it this year so I was on my own. Decided to run 1B - Battery and setup at a local lake. Texas is known for 100F+ temps during Field Days and this one was no exception. However, the wind blew constantly and setting in the shade made the heat bearable. I strung up a 40m delta loop and had a 102" stainless steel whip that I trimmed down for 10m use mounted on the back of my truck. Ended up with 306 contacts in the log in a little over 4 hours of total operating time. I wasn't able to operate the whole FD as I had other commitments. A few things I learned. My LDG Electronics Z100 tuner had no problems matching my 40m delta loop on 15m and 10m. I know its not very efficient but I was still able to make contacts. My rig was a FT-897D running 5 watts.
-- W5LLBack